Pothole Repairs in Parking Lot

The Board has been discussing low cost, short term alternatives to patch and repair some of the worst potholes in the parking lot. The medium term/long term plan (subject to receiving our new Reserve Fund Study in Fall 2016) is to have the entire parking lot replaced. This is very costly and will need to be properly timed to ensure that it is done efficiently.

In the meantime, the Board will be filling in some of the deepest potholes over the next week or 2 with store bought asphalt patch to create a short term solution until the lot can be replaced.

Advertisements

Comments are closed.